The Reskerton viaduct is now more or less completed, so all that's left to do is test the track and signalling equipment, and build the new high-level platforms for the station. The town's 3 crossings are now set to be removed. Reskerton signal box is still in control of this end of the line - although there are plans to re-signal the whole route to Mereston IECC, that's not happening yet. The only change from this project is it no longer controls 2 of its road crossings (with Ruston crossing also set to go next year once the branch line gets removed).
All the updates and showcasing is done on my YouTube page (the Minecraft Railways Board), but I thought I'd share some photos here too so everyone has a clear view of what's going on. (Psst! Just a side note, I made this entire gallery from my phone in about 10-15 minutes ;) )