This is probably going to be the only such installation with the DS-1 logic released on Scratch, firstly due to its inefficiency and secondly due to a newer, more efficient logic being released (DM-1).
This lift was an additional installation in 2023 to connect the Tower Block with St. Dominic's Hospital Skyline Metro station. Such installations with DS-1 logic are getting rarer to find due to the replacement of logic in existing Dude Lift installations. However this was a notable exception, because it only serves 2 floors, and therefore does not need a logic upgrade. Lift specifications: Model: D-S1 Floors served: 1,2 Installed in August 2024