KM-55 Mod. 3 ---- Engines have been swapped for twin KM-3003 Scramjet Engines and twin KM-2034M Turbojet-Ramjet Hybrid Engines, providing a TWR of 0.45 at takeoff and 0.18 at cruising altitude (45km) The remaining two prototypes will be fitted with upgrades. Estimated service date: mid 2028 - early 2029. Investment is open to the entire world as Bhahsania shifts to a more cautious stance towards North Rheia following the Jinzhaoii Civil War, thereby accelerating the KM-55 program. KM-55 Mod. 3 will be revealed to the public at the BAF's airshow taking place on the 15th - 16th of May 2028.
slop as always