Checklist: [Important: DOUBLE CLICK GREEN FLAG] ------------------------------------------------------------------------- [Normal Operations] -Startup Sw. -Coolant switch Alpha and Bravo -Rods in at operating temp (2000-3000 ⁰K) to 60% to stabilize the reactor. -Synchronise turbines at 3000 RPM -Pwr. Order Sw. (Cannot be activated below 373 ⁰K) ------------------------------------------------------------------------- [Emergencies] >Turbine Malfunction -Send plant maintenance via radio, simple as that. >Reactor Overheating -Start inserting the rods. >Reactor Meltdown -Good luck. SCRAM before a thermal runaway occurs.
Power will only be produced if the turbines are synchronised and the temperature is above the boiling point of water. (373 ⁰K) You have a 150 MW margin of error for power orders; you have to hold the power orders for 20 seconds to complete them. ------------------------------------------------------------------------ The function and design of the panels are directly from the game Naramo Nuclear Power Plant. Sound effects are sourced from wherever I could find them, mostly from myinstants. Leave suggestions/bugs in comments. UPDATES: 02-07-26: Project published. 03-07-26: Fixed issues with the ending screens and turbine 2 synchronisation. Added quick-start tab.