Basilian Logistics as recorded by the Interior, and LG-COM cannot sustain such a mass expansion of a space fleet. The creation of a possible drop pod/landing pod policy must be made. As proposed, mass spacecraft are launched by kinetic launch mechanisms, allowing for propulsion without general antimatter engines. Planetary "hubs" which shall hold resources and the distribution of resources to factory systems shall be erected to allow for further development. Orbital rings, are to be developed for further docking and mechanical purposes. Ground launch wastes valuable time as the Department of Transportation and Communication Reports. The Armed Forces of Basilia has found an extreme issue following the logistics shortages referenced by LG-COM. The Department of Transportation and Communications has found further logistics issues within civilian sectors. The Department of Economics, followed by the State Investment Bureau and Development Bureau has found a constant lack of further resource movement. The Department of the Interior has found an increase in total resources being expended Whereas, Directive 55 calls for "building of more ships," and the System of Gertok to hold the possible mass shipyard. This shall allow for further force projection and patrol capabilities. Whereas, Directive 54 calls for a mass expansion of the Ground Forces for planetary defense and landing and the creation of the Bureau of Military Intelligence, BMI. Whereas, Directive 53 calls for the creation of more Bureaus under the Department of Advanced Sciences, to begin the creation of new technologies and weapons. All Directives, currently undergoing signing may allow for further refrence in proceedings.
this is so buns