[ freezedown is done] [Meltdown is done] If the button not show, press the green flag EARLY ACCESS CONTROLS W for warhead S for dev start M for meltdown F for freezedown shutdown automatic 100K(2 chance of failure) 1 to overload power laser 1 2 to overload power laser 2
Very thanks for marioBrosU22 for creating project I fixed bugs and added kelvin system And now I finished meltdown